Search
Search

PELATIHAN DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS

Daftar Isi

PENGANTAR TRAINING PERMIT TO WORK SYSTEMS

Permit to work are used to control high risk work activities, such as hot work, work at height, confined spaces work etc. Method statements are used in many industries, again as a control measure to detail the correct and safe sequence for work operation.

TUJUAN TRAINING METHOD STATEMENTS

The purpose of this training is to help in determining if a job requires a work permit due to ESS&H hazards, system complexities, or work coordination needs. If the job already has an established work procedure or has been reviewed and defined as “Worker Planned” work due to the training and qualifications of the crafts person or technician, then the checklist is not needed.

SASARAN PESERTA TRAINING WORK PERMIT PROCEDURES OFFLINE JOGJA

Anyone who uses or issues permits to work and anyone who produces or used method statements.

OUTLINE TRAINING WORK PERMIT PROCEDURES

1. Overview of safe systems of work
1. Human Engineering
2. Machine and Tools guarding
3. Behavioral factors
2. The purpose of permits and method statements
1. ESS&H or Other Permits Needed
2. Safety, Security and Facility Concerns
3. Environmental/Waste Concerns
4. Radiation Issues
5. Complexity/Uncertainty Issues
6. Work Coordination
3. Permit to work systems
4. Use of the documents in practice
5. Document templates will be provided to all delegates during the course.

INSTRUKTUR PELATIHAN METHOD STATEMENTS BANDUNG

Instruktur yang mengajar pelatihan ini adalah pemateri yang berkompeten di bidangnya dengan baik datang dari kalangan akademisi maupun praktisi.

Kami sangat terbuka jika anda ingin berkomunikasi terlebih dahulu tim trainer sehingga outline dapat disesuaikan dengan outcome kompetensi yang diharapkan. 

METODE PELATIHAN WORK PERMIT PROCEDURES KUALA LUMPUR

1. Presentation
2. Discuss
3. Case Study
4. Evaluation
5. Pre-Test & Post-Test
6. Games

Metode dapat disesuaikan sesuai kebutuhan peserta ataupun perusahaan. Kami sangat terbuka untuk berdiskusi menentukan metode yang paling efektif.

Jadwal Diorama Training Tahun 2026

  • Januari : 20 – 21 Januari 2026
  • Februari : 24 – 25 Februari 2026
  • Maret : 05 – 06 Maret 2026
  • April : 23 – 24 April 2026
  • Mei : 19 – 20 Mei 2026
  • Juni : 23 – 24 Juni 2026
  • Juli : 23 – 24 Juli 2026
  • Agustus : 27 – 28 Agustus 2026
  • September : 15 – 16 September 2026
  • Oktober : 20 – 21 Oktober 2026
  • November : 17 – 18 November 2026
  • Desember : 15 – 16 Desember 2026

Catatan: Jadwal tersebut dapat disesuaikan dengan kebutuhan calon peserta. Peserta dapat mengajukan tanggal pelaksanaan pelatihan. Sebelum melakukan booking tiket perjalanan maupun hotel mohon untuk menghubungi marketing kami terlebih dahulu. Kesalahan pemesanan tiket terkait jadwal tanpa surat konfirmasi (Confirmation Letter) bukan merupakan tanggung jawab tim Diorama Training.

LOKASI 

REGULER TRAINING

  • Yogyakarta, Hotel Fortuna Grande Malioboro (6.000.000 IDR / participant)
  • Jakarta, Hotel Amaris Kemang  La Codefin (6.500.000 IDR / participant)
  • Bandung, Hotel Neo Dipatiukur (6.500.000 IDR / participant)
  • Bali, Hotel Ibis Kuta (7.500.000 IDR / participant)
  • Lombok, Hotel Jayakarta (7.500.000 IDR / participant)
  • Surabaya, Hotel Neo Gubeng (7.500.000 IDR / participant)

ONLINE TRAINING VIA ZOOM

INVESTASI 

  • Investasi pelatihan selama tiga hari tersebut menyesuaikan dengan jumlah peserta (on call). *Please feel free to contact us.

Catatan: Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Benefit Apa Saja yang Didapatkan Peserta?

  • FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara)
  • FREE Transportasi Peserta ke tempat pelatihan (By Request)
  • Module / Handout
  • FREE Flashdisk
  • Sertifikat
  • FREE Bag or backpack (Tas Training)
  • Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
  • 2x Coffee Break & 1 Lunch, Dinner
  • FREE Souvenir Exclusive

FAQ tentang Diotraining

P : Berapa minimal running pelatihan ini ?
J : Pelatihan ini akan running idealnya minimal dengan 3 peserta, tetapi bisa disesuaikan dengan kebutuhan peserta

P : Apakah bisa jika saya hanya ingin pelatihan sendiri aja / private course ?
J : Bisa, kami akan membantu menyelenggarakan pelatihan 1 hari jika ada persetujuan dari klien

P : Dimana saja pelatihan biasanya di selenggarakan?
J : Pelatihan kami selenggarakan di beberapa kota besar di Indonesia seperti Bandung, Jakarta, Yogyakarta, Surabaya, Malang, Bali, Lombok dan beberapa negara seperti Singapore dan Malaysia

P : Apakah bisa diselenggarakan selain di kota lain?
J : Penyelenggaraan pelatihan bisa diadakan di kota lain dengan minimal kuota 5 orang setiap kelas

P : Apakah bisa juga diselenggarakan secara IHT/ In House Training di Perusahaan klien ?
J : Bisa diselenggarakan secara IHT di Perusahaan klien

P : Apakah jadwal bisa disesuaikan dengan kebutuhan klien ?
J : Jadwal pelatihan dapat di sesuaikan dengan kebutuhan klien.

 

Materi, Lokasi dan Jadwal Pelatihan Bisa Berubah Sewaktu-waktu dan disesuaikan Dengan Kondisi Peserta, dimohon untuk Melakukan Konfirmasi untuk Segala Bentuk Perubahan, agar Tidak Terjadi Miskomunikasi. Segera Daftarkan Pelatihan, Dapatkan Promo Menarik Bulan Ini.

 

Beberapa Klien Kami

training diotraining klien

 

 

Silabus Training ini di edit oleh Wafa Setiawan sebagai Content Writer Spesialis. Tim Diorama Training di bidang Pelatihan Konsultasi Sumbedaya Manusia dan Sertifikasi.  

Azmi Diorama Training

AZMI

082311445878

Dian Marketing Diorama

DIAN

085186657577

SABRINA

08135354778

ISNA

081318885447

NONA

082123463977